In short
For a 25–30 m² living room, the ceiling is framed and boarded in 2–3 days and filled in another 1–2. The price depends mostly on the design: a flat ceiling costs much less than one with steps and hidden lighting. See what drives the cost.
How a suspended ceiling is built
First we mark the final height on every wall with a laser and fix the UD perimeter track. From the slab we hang rods every 80–100 cm and attach the CD 60×27 main channels to them. The frame is levelled, and only then do we screw on the boards across the channels, staggering the joints so they never line up.
The joints get tape and filler in two or three coats. Corners get corner beads so they stay straight and do not chip.
Hidden lighting and spotlights
Hidden (cove) lighting is an LED strip inside a channel along the perimeter or around a recess. The light falls on the ceiling and the room feels taller. We design the channel together with the electrician, so the driver fits and the strip is easy to replace.
Recessed spots need at least 8–10 cm of space below the slab. If you want recessed spots across the whole living room, tell us at the site visit, because that sets how far the ceiling drops. More on the hidden lighting page.

Air conditioning, ventilation and hatches
In new homes and in Loutraki's hotels, AC ducts or ducted indoor units often go inside the ceiling. We leave openings for the vents and hinged access hatches, so filters can be cleaned and the technician can reach the unit without breaking anything.
Ceilings in bathrooms, balconies or under a roof
In bathrooms we use green moisture-resistant board, and the room must be ventilated. Under a roof or in an attic we first add insulation and a vapour barrier. For outdoor areas such as balcony soffits there are cement boards that withstand rain and sea salt. Ask us about your case.
From the crewIf the slab shows damp or flaking plaster, we tell you before we start. A ceiling hides the problem, it does not solve it. Waterproofing first, drywall second.